iBet uBet web content aggregator. Adding the entire web to your favor.
iBet uBet web content aggregator. Adding the entire web to your favor.



Link to original content: https://web.archive.org/web/20060223004217/http://www.centraltexasturnpike.org/loop1/
CTTS - Central Texas Turnpike System
The Wayback Machine - https://web.archive.org/web/20060223004217/http://www.centraltexasturnpike.org:80/loop1/
Header Top 1
 
 
Information
View the latest Monthly Activity Report

Free email subscription to the Monthly Activity Report

Purpose

To relieve congestion on existing Loop 1 and other surrounding roadways by providing a more efficient route between northern Travis and southern Williamson counties.

Description

The Loop 1 extension will be approximately three miles long from Parmer Lane to SH 45 North. It will be a six-lane divided roadway with limited frontage roads.

This project is part of the 2002 Project of the Central Texas Turnpike System, which also includes SH 45 North and the northern 49 miles of SH 130. (Funds for the 2002 Project are detailed in the 2002 Project financing.)

Construction Schedule
Project Limits   Open to Traffic
Parmer Lane to SH 45 North   January 2007

  Texas Department of Transportation Logo COPYRIGHT 2005 CTTS | CONTENT USAGE | FORWARD-LOOKING DISCLAIMER | LINK DISCLAIMER | PRIVACY POLICY | ACCESSIBILITY