{"id":"https://openalex.org/W2138293488","doi":"https://doi.org/10.1109/isip.2008.127","title":"Dynamic Scheduling and Control System Based on Multi-layer Mixed Construction of Manufacturing Resource Agents","display_name":"Dynamic Scheduling and Control System Based on Multi-layer Mixed Construction of Manufacturing Resource Agents","publication_year":2008,"publication_date":"2008-05-01","ids":{"openalex":"https://openalex.org/W2138293488","doi":"https://doi.org/10.1109/isip.2008.127","mag":"2138293488"},"language":"en","primary_location":{"is_oa":false,"landing_page_url":"https://doi.org/10.1109/isip.2008.127","pdf_url":null,"source":null,"license":null,"license_id":null,"version":null,"is_accepted":false,"is_published":false},"type":"article","type_crossref":"proceedings-article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5103221780","display_name":"Yan Cao","orcid":"https://orcid.org/0000-0001-5510-9773"},"institutions":[{"id":"https://openalex.org/I4210110558","display_name":"Xi'an Technological University","ror":"https://ror.org/01t8prc81","country_code":"CN","type":"education","lineage":["https://openalex.org/I4210110558"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Yan Cao","raw_affiliation_strings":["Advanced Manufacturing Engineering Institute, School of Mechatronic Engineering, Xi'an Technological University, Xi'an, Shaanxi, China"],"affiliations":[{"raw_affiliation_string":"Advanced Manufacturing Engineering Institute, School of Mechatronic Engineering, Xi'an Technological University, Xi'an, Shaanxi, China","institution_ids":["https://openalex.org/I4210110558"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5030659829","display_name":"Yanli Yang","orcid":"https://orcid.org/0000-0003-1919-8857"},"institutions":[{"id":"https://openalex.org/I180726961","display_name":"Shenzhen University","ror":"https://ror.org/01vy4gh70","country_code":"CN","type":"education","lineage":["https://openalex.org/I180726961"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Yanli Yang","raw_affiliation_strings":["Shenzhen University, Shenzhen, Guangdong, China"],"affiliations":[{"raw_affiliation_string":"Shenzhen University, Shenzhen, Guangdong, China","institution_ids":["https://openalex.org/I180726961"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5022815251","display_name":"Lina Yang","orcid":"https://orcid.org/0000-0002-1742-9941"},"institutions":[{"id":"https://openalex.org/I110440473","display_name":"Xi'an University of Science and Technology","ror":"https://ror.org/046fkpt18","country_code":"CN","type":"education","lineage":["https://openalex.org/I110440473"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Lina Yang","raw_affiliation_strings":["Xi''an University of Science and Technology, Xi'an, Shaanxi, China"],"affiliations":[{"raw_affiliation_string":"Xi''an University of Science and Technology, Xi'an, Shaanxi, China","institution_ids":["https://openalex.org/I110440473"]}]}],"institution_assertions":[],"countries_distinct_count":1,"institutions_distinct_count":3,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.716,"has_fulltext":true,"fulltext_origin":"ngrams","cited_by_count":2,"citation_normalized_percentile":{"value":0.479122,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":70,"max":74},"biblio":{"volume":null,"issue":null,"first_page":null,"last_page":null},"is_retracted":false,"is_paratext":false,"primary_topic":{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.9957,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.9957,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11814","display_name":"Advanced Manufacturing and Logistics Optimization","score":0.9916,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T12594","display_name":"Collaboration in agile enterprises","score":0.9763,"subfield":{"id":"https://openalex.org/subfields/1405","display_name":"Management of Technology and Innovation"},"field":{"id":"https://openalex.org/fields/14","display_name":"Business, Management and Accounting"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/agile-manufacturing","display_name":"Agile Manufacturing","score":0.569027},{"id":"https://openalex.org/keywords/production-control","display_name":"Production control","score":0.5083963}],"concepts":[{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.62771255},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.62212914},{"id":"https://openalex.org/C9233905","wikidata":"https://www.wikidata.org/wiki/Q3276328","display_name":"Bidding","level":2,"score":0.6164829},{"id":"https://openalex.org/C107568181","wikidata":"https://www.wikidata.org/wiki/Q5319000","display_name":"Dynamic priority scheduling","level":3,"score":0.5994295},{"id":"https://openalex.org/C2780615885","wikidata":"https://www.wikidata.org/wiki/Q4692546","display_name":"Agile manufacturing","level":3,"score":0.569027},{"id":"https://openalex.org/C120314980","wikidata":"https://www.wikidata.org/wiki/Q180634","display_name":"Distributed computing","level":1,"score":0.5602609},{"id":"https://openalex.org/C14185376","wikidata":"https://www.wikidata.org/wiki/Q30232","display_name":"Agile software development","level":2,"score":0.52763695},{"id":"https://openalex.org/C2780682718","wikidata":"https://www.wikidata.org/wiki/Q16321575","display_name":"Production control","level":3,"score":0.5083963},{"id":"https://openalex.org/C41550386","wikidata":"https://www.wikidata.org/wiki/Q529909","display_name":"Multi-agent system","level":2,"score":0.41338164},{"id":"https://openalex.org/C13736549","wikidata":"https://www.wikidata.org/wiki/Q4489420","display_name":"Industrial engineering","level":1,"score":0.3408571},{"id":"https://openalex.org/C117671659","wikidata":"https://www.wikidata.org/wiki/Q11049265","display_name":"Manufacturing engineering","level":1,"score":0.32348257},{"id":"https://openalex.org/C2778348673","wikidata":"https://www.wikidata.org/wiki/Q739302","display_name":"Production (economics)","level":2,"score":0.30613616},{"id":"https://openalex.org/C68387754","wikidata":"https://www.wikidata.org/wiki/Q7271585","display_name":"Schedule","level":2,"score":0.20769891},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.17293885},{"id":"https://openalex.org/C154945302","wikidata":"https://www.wikidata.org/wiki/Q11660","display_name":"Artificial intelligence","level":1,"score":0.12395096},{"id":"https://openalex.org/C21547014","wikidata":"https://www.wikidata.org/wiki/Q1423657","display_name":"Operations management","level":1,"score":0.09359586},{"id":"https://openalex.org/C115903868","wikidata":"https://www.wikidata.org/wiki/Q80993","display_name":"Software engineering","level":1,"score":0.0},{"id":"https://openalex.org/C139719470","wikidata":"https://www.wikidata.org/wiki/Q39680","display_name":"Macroeconomics","level":1,"score":0.0},{"id":"https://openalex.org/C162853370","wikidata":"https://www.wikidata.org/wiki/Q39809","display_name":"Marketing","level":1,"score":0.0},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.0},{"id":"https://openalex.org/C144133560","wikidata":"https://www.wikidata.org/wiki/Q4830453","display_name":"Business","level":0,"score":0.0},{"id":"https://openalex.org/C111919701","wikidata":"https://www.wikidata.org/wiki/Q9135","display_name":"Operating system","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"is_oa":false,"landing_page_url":"https://doi.org/10.1109/isip.2008.127","pdf_url":null,"source":null,"license":null,"license_id":null,"version":null,"is_accepted":false,"is_published":false}],"best_oa_location":null,"sustainable_development_goals":[],"grants":[],"datasets":[],"versions":[],"referenced_works_count":4,"referenced_works":["https://openalex.org/W1976109100","https://openalex.org/W1978386360","https://openalex.org/W2081779975","https://openalex.org/W2167741587"],"related_works":["https://openalex.org/W2534606817","https://openalex.org/W2389754756","https://openalex.org/W2389286292","https://openalex.org/W2387920521","https://openalex.org/W2382224273","https://openalex.org/W2360751371","https://openalex.org/W2355561715","https://openalex.org/W2355326491","https://openalex.org/W2354672745","https://openalex.org/W2139253774"],"abstract_inverted_index":{"Faced":[0],"with":[1],"processing":[2],"time":[3],"uncertainties,":[4],"equipment":[5],"reliability/availability,":[6],"demand":[7],"changes,":[8],"manpower":[9],"fluctuation":[10],"and":[11,26,37,59,78,85,90,120,128],"so":[12],"on":[13,29],"in":[14,103],"a":[15,104],"dynamic":[16,86],"manufacturing":[17,61,105,112],"environment,":[18],"an":[19,110],"organization":[20],"structure":[21,44],"for":[22],"agile":[23,111],"production":[24,98,123],"scheduling":[25,79],"control":[27,119],"based":[28],"MAS":[30,91],"is":[31,45,55,80],"put":[32,46],"forward":[33,47],"to":[34,48,57,97,116],"achieve":[35],"effective":[36],"efficient":[38],"production.":[39],"A":[40],"hybrid":[41],"multi-layer":[42],"agent":[43],"facilitate":[49],"constructing":[50],"various":[51,132],"agents.":[52,133],"Bidding":[53],"mechanism":[54],"adopted":[56],"decompose":[58],"assign":[60],"tasks":[62],"that":[63],"determine":[64],"the":[65,126],"cooperative":[66,129],"relationship":[67],"among":[68],"agents":[69,115],"at":[70],"different":[71],"levels.":[72],"The":[73],"integration":[74],"of":[75,114,131],"task":[76],"assignment":[77],"realized":[81],"through":[82],"capability":[83],"matching":[84],"scheduling.":[87],"Agent":[88],"granularity":[89],"model":[92],"are":[93,107],"determined":[94],"dynamically":[95],"according":[96],"demands.":[99],"Consequently,":[100],"all":[101],"resources":[102],"system":[106],"reorganized":[108],"into":[109],"network":[113],"collaboratively":[117],"plan,":[118],"manage":[121],"distributed":[122],"by":[124],"exploiting":[125],"autonomous":[127],"characteristics":[130]},"cited_by_api_url":"https://api.openalex.org/works?filter=cites:W2138293488","counts_by_year":[{"year":2012,"cited_by_count":1}],"updated_date":"2024-12-07T16:28:45.969515","created_date":"2016-06-24"}