iBet uBet web content aggregator. Adding the entire web to your favor.
iBet uBet web content aggregator. Adding the entire web to your favor.



Link to original content: https://api.crossref.org/works/10.1177/1063293X05059806
{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,19]],"date-time":"2024-09-19T04:06:48Z","timestamp":1726718808128},"reference-count":31,"publisher":"SAGE Publications","issue":"4","license":[{"start":{"date-parts":[[2005,12,1]],"date-time":"2005-12-01T00:00:00Z","timestamp":1133395200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/journals.sagepub.com\/page\/policies\/text-and-data-mining-license"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Concurrent Engineering"],"published-print":{"date-parts":[[2005,12]]},"abstract":" Taking into account the supplier involvement in the new product development (NPD), this article focuses on the synthesis evaluation, and selection of the part design scheme in part deployment process. The concepts of performance indicator (PI) and integrated performance indicators (IPI) are introduced to measure the performance of the part design scheme and product design scheme respectively. A two-layer fuzzy synthesis evaluation method is applied to assess the part design scheme in a supplier-involved new product development process. Combining the information of House of Quality (HoQ) and evaluation results of the part design scheme and taking into account the design budget, a 0\u20131 integer programming model is developed for selection of the parts combinatorial scheme in supplier-involved part deployment processes. A case study with a type of liquid crystal display (LCD) design in an Electronic Appliance Manufacturing Enterprise is also illustrated in the article. <\/jats:p>","DOI":"10.1177\/1063293x05059806","type":"journal-article","created":{"date-parts":[[2005,12,14]],"date-time":"2005-12-14T15:26:05Z","timestamp":1134573965000},"page":"277-289","source":"Crossref","is-referenced-by-count":15,"title":["Synthesis, Evaluation, and Selection of Parts Design Scheme in Supplier Involved Product Development"],"prefix":"10.1177","volume":"13","author":[{"given":"Jiafu","family":"Tang","sequence":"first","affiliation":[{"name":"Department of Systems Engineering, Key Laboratory of Process Industrial Automation of MOE, School of Information Science & Engineering, Northeastern University (NEU), Shenyang, 110004, P.R.China"}]},{"given":"Yan-e","family":"Zhang","sequence":"additional","affiliation":[{"name":"Department of Systems Engineering, Key Laboratory of Process Industrial Automation of MOE, School of Information Science & Engineering, Northeastern University (NEU), Shenyang, 110004, P.R.China"}]},{"given":"Yiliu","family":"Tu","sequence":"additional","affiliation":[{"name":"Department of Mechanical and Manufacturing Engineering, University of\r Calgary, 2500 University Drive NW Calgary, Alberta, T2N 1N4, Canada"}]},{"given":"Yizeng","family":"Chen","sequence":"additional","affiliation":[{"name":"Department of Industrial & Systems Engineering, The Hong Kong Polytechnic University Hung Hom, Kowloon, Hong Kong"}]},{"given":"Ying","family":"Dong","sequence":"additional","affiliation":[{"name":"Department of Systems Engineering, Key Laboratory of Process Industrial Automation of MOE, School of Information Science & Engineering, Northeastern University (NEU), Shenyang, 110004, P.R.China"}]}],"member":"179","published-online":{"date-parts":[[2005,12,1]]},"reference":[{"volume-title":"Quality Function Deployment: Integrating Customer Requirements into Product Design","year":"1990","author":"Akao, Y.","key":"atypb1"},{"key":"atypb2","doi-asserted-by":"publisher","DOI":"10.1080\/07408179408966620"},{"key":"atypb3","doi-asserted-by":"publisher","DOI":"10.1016\/S0048-7333(97)00034-6"},{"key":"atypb4","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(02)00178-9"},{"issue":"2","key":"atypb5","first-page":"127","volume":"9","author":"Chen, Y.Z.","year":"2003","journal-title":"Chinese Journal of Computer Integrated Manufacture Systems-CIMS"},{"key":"atypb6","doi-asserted-by":"publisher","DOI":"10.1504\/IJTM.2002.003002"},{"key":"atypb7","doi-asserted-by":"publisher","DOI":"10.1016\/S0737-6782(99)00009-0"},{"key":"atypb8","doi-asserted-by":"publisher","DOI":"10.1080\/00207540110061634"},{"key":"atypb9","doi-asserted-by":"publisher","DOI":"10.1007\/s00163-003-0043-3"},{"issue":"1","key":"atypb10","first-page":"23","volume":"10","author":"Gui, Z.","year":"2003","journal-title":"Chinese Journal of Machine Tool and Hydraulic Pressure"},{"key":"atypb11","doi-asserted-by":"publisher","DOI":"10.1115\/1.1618818"},{"issue":"3","key":"atypb12","first-page":"63","volume":"66","author":"Hauser, J.R.","year":"1988","journal-title":"Harvard Business Review"},{"key":"atypb13","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(99)00114-0"},{"key":"atypb14","doi-asserted-by":"publisher","DOI":"10.1016\/S0969-7012(97)00023-3"},{"key":"atypb15","doi-asserted-by":"publisher","DOI":"10.1177\/1063293X05051772"},{"key":"atypb16","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(99)00048-X"},{"key":"atypb17","doi-asserted-by":"publisher","DOI":"10.1016\/S0148-2963(98)00066-6"},{"key":"atypb18","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(00)00023-2"},{"volume-title":"Engineering Design: A Systematic Approach","year":"1998","author":"Pahl, G.","key":"atypb19"},{"key":"atypb20","doi-asserted-by":"publisher","DOI":"10.1016\/S0278-6125(98)80063-0"},{"key":"atypb21","doi-asserted-by":"publisher","DOI":"10.1080\/09544820050034213"},{"key":"atypb22","doi-asserted-by":"publisher","DOI":"10.1016\/S0148-2963(00)00158-2"},{"key":"atypb23","doi-asserted-by":"publisher","DOI":"10.1108\/14601060010298435"},{"key":"atypb24","doi-asserted-by":"publisher","DOI":"10.1016\/S0048-7333(00)00157-8"},{"key":"atypb25","doi-asserted-by":"publisher","DOI":"10.1016\/S0305-0548(01)00041-7"},{"issue":"4","key":"atypb26","first-page":"50","volume":"5","author":"Tang, J.F.","year":"2004","journal-title":"The Asia Journal on Quality"},{"key":"atypb27","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(00)00094-3"},{"key":"atypb28","doi-asserted-by":"publisher","DOI":"10.1016\/S0272-6963(99)00020-0"},{"key":"atypb29","doi-asserted-by":"publisher","DOI":"10.1080\/07408179308964291"},{"key":"atypb30","doi-asserted-by":"publisher","DOI":"10.1016\/S0969-7012(00)00002-2"},{"key":"atypb31","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-2373(00)00090-6"}],"container-title":["Concurrent Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.1177\/1063293X05059806","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.1177\/1063293X05059806","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,9,18]],"date-time":"2024-09-18T04:54:06Z","timestamp":1726635246000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/10.1177\/1063293X05059806"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2005,12]]},"references-count":31,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2005,12]]}},"alternative-id":["10.1177\/1063293X05059806"],"URL":"http:\/\/dx.doi.org\/10.1177\/1063293x05059806","relation":{},"ISSN":["1063-293X","1531-2003"],"issn-type":[{"type":"print","value":"1063-293X"},{"type":"electronic","value":"1531-2003"}],"subject":[],"published":{"date-parts":[[2005,12]]}}}