{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,15]],"date-time":"2024-09-15T22:39:26Z","timestamp":1726439966782},"publisher-location":"New York, NY, USA","reference-count":35,"publisher":"ACM","license":[{"start":{"date-parts":[[2019,8,5]],"date-time":"2019-08-05T00:00:00Z","timestamp":1564963200000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.acm.org\/publications\/policies\/copyright_policy#Background"}],"content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2019,8,5]]},"DOI":"10.1145\/3339186.3339209","type":"proceedings-article","created":{"date-parts":[[2019,7,22]],"date-time":"2019-07-22T12:18:25Z","timestamp":1563797905000},"page":"1-8","update-policy":"http:\/\/dx.doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":3,"title":["An Analysis of Contracts and Relationships between Supercomputing Centers and Electricity Service Providers"],"prefix":"10.1145","author":[{"given":"Anders","family":"Clausen","sequence":"first","affiliation":[{"name":"Energy Efficiency High-Performance, Working Group - Grid Integration"}]},{"given":"Gregory","family":"Koenig","sequence":"additional","affiliation":[{"name":"Energy Efficiency High-Performance, Working Group - Grid Integration"}]},{"given":"Sonja","family":"Klingert","sequence":"additional","affiliation":[{"name":"Energy Efficiency High-Performance, Working Group - Grid Integration"}]},{"given":"Girish","family":"Ghatikar","sequence":"additional","affiliation":[{"name":"Energy Efficiency High-Performance, Working Group - Grid Integration"}]},{"given":"Peter M.","family":"Schwartz","sequence":"additional","affiliation":[{"name":"Energy Efficiency High-Performance, Working Group - Grid Integration"}]},{"given":"Natalie","family":"Bates","sequence":"additional","affiliation":[{"name":"Energy Efficiency High-Performance, Working Group - Grid Integration"}]}],"member":"320","published-online":{"date-parts":[[2019,8,5]]},"reference":[{"volume-title":"Federal Energy Regulatory Commission","year":"2006","key":"e_1_3_2_1_1_1","unstructured":"2006 assessment of DR and advanced metering. Tech. rep ., Federal Energy Regulatory Commission , 2006 . 2006 assessment of DR and advanced metering. Tech. rep., Federal Energy Regulatory Commission, 2006."},{"volume-title":"Federal Energy Regulatory Commission","year":"2012","key":"e_1_3_2_1_2_1","unstructured":"2012 assessment of DR and advanced metering. Tech. rep ., Federal Energy Regulatory Commission , 2012 . 2012 assessment of DR and advanced metering. Tech. rep., Federal Energy Regulatory Commission, 2012."},{"key":"e_1_3_2_1_3_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2009.05.041"},{"key":"e_1_3_2_1_4_1","first-page":"143","volume-title":"Proceedings of the conference on Design, Automation & Test in Europe","author":"Aksanli B.","year":"2014","unstructured":"Aksanli , B. , and Rosing , T . Providing regulation services and managing data center peak power budgets . In Proceedings of the conference on Design, Automation & Test in Europe ( 2014 ), European Design and Automation Association , p. 143 . Aksanli, B., and Rosing, T. Providing regulation services and managing data center peak power budgets. In Proceedings of the conference on Design, Automation & Test in Europe (2014), European Design and Automation Association, p. 143."},{"volume-title":"Making data centres fit for demand response: introducing greensda and greensla contracts","year":"2016","author":"Basmadjian R.","key":"e_1_3_2_1_5_1","unstructured":"Basmadjian , R. , Botero , J. F. , Giuliani , G. , Hesselbach , X. , Klingert , S. , and De Meer , H. Making data centres fit for demand response: introducing greensda and greensla contracts . IEEE transactions on smart grid ( 2016 ). Basmadjian, R., Botero, J. F., Giuliani, G., Hesselbach, X., Klingert, S., and De Meer, H. Making data centres fit for demand response: introducing greensda and greensla contracts. IEEE transactions on smart grid (2016)."},{"key":"e_1_3_2_1_6_1","doi-asserted-by":"publisher","DOI":"10.1109\/SustainIT.2013.6685195"},{"key":"e_1_3_2_1_7_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00287-014-0850-0"},{"volume-title":"Transmission and distribution electrical engineering","year":"2012","author":"Bayliss C. R.","key":"e_1_3_2_1_8_1","unstructured":"Bayliss , C. R. , Bayliss , C. , and Hardy , B. J . Transmission and distribution electrical engineering . Elsevier , 2012 . Bayliss, C. R., Bayliss, C., and Hardy, B. J. Transmission and distribution electrical engineering. Elsevier, 2012."},{"key":"e_1_3_2_1_9_1","first-page":"4762","volume-title":"IECON 2013-39th Annual Conference of the IEEE","author":"Berl A.","year":"2013","unstructured":"Berl , A. , Klingert , S. , Beck , M. T. , and de Meer , H. Integrating data centres into demand-response management: a local case study. In Industrial Electronics Society , IECON 2013-39th Annual Conference of the IEEE ( 2013 ), IEEE, pp. 4762 -- 4767 . Berl, A., Klingert, S., Beck, M. T., and de Meer, H. Integrating data centres into demand-response management: a local case study. In Industrial Electronics Society, IECON 2013-39th Annual Conference of the IEEE (2013), IEEE, pp. 4762--4767."},{"volume-title":"Capgemini","year":"2008","author":"Chardon A.","key":"e_1_3_2_1_10_1","unstructured":"Chardon , A. , Alm\u00e9n , D. , Lewis , D. P. E. , Stromback , J. , Ch\u00e2teau , B. , Demand response: a decisive breakthrough for europe. Tech. rep ., Capgemini , 2008 . Chardon, A., Alm\u00e9n, D., Lewis, D. P. E., Stromback, J., Ch\u00e2teau, B., et al. Demand response: a decisive breakthrough for europe. Tech. rep., Capgemini, 2008."},{"key":"e_1_3_2_1_11_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.future.2016.05.010"},{"key":"e_1_3_2_1_12_1","doi-asserted-by":"publisher","DOI":"10.1109\/IGCC.2014.7039161"},{"key":"e_1_3_2_1_13_1","doi-asserted-by":"publisher","DOI":"10.1109\/MPE.2009.934876"},{"volume-title":"Trends in energy efficient supercomputing. https:\/\/eehpcwg.llnl.gov\/pages\/conf_sc17a.htm","year":"2017","author":"Feng W.","key":"e_1_3_2_1_14_1","unstructured":"Feng , W. , Strohamier , E. , Scogland , T. , and Bates , N . Trends in energy efficient supercomputing. https:\/\/eehpcwg.llnl.gov\/pages\/conf_sc17a.htm , 2017 . Birds of feather. Feng, W., Strohamier, E., Scogland, T., and Bates, N. Trends in energy efficient supercomputing. https:\/\/eehpcwg.llnl.gov\/pages\/conf_sc17a.htm, 2017. Birds of feather."},{"volume-title":"Demand-side management","year":"1988","author":"Gellings C. W.","key":"e_1_3_2_1_15_1","unstructured":"Gellings , C. W. , and Chamberlin , J . Demand-side management , 1988 . Gellings, C. W., and Chamberlin, J. Demand-side management, 1988."},{"key":"e_1_3_2_1_16_1","doi-asserted-by":"publisher","DOI":"10.2172\/1174175"},{"key":"e_1_3_2_1_17_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2014.02.019"},{"key":"e_1_3_2_1_18_1","doi-asserted-by":"publisher","DOI":"10.1109\/ISGTEurope.2013.6695393"},{"key":"e_1_3_2_1_19_1","doi-asserted-by":"publisher","DOI":"10.1109\/HPCA.2015.7056036"},{"key":"e_1_3_2_1_20_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2010.12.027"},{"key":"e_1_3_2_1_21_1","doi-asserted-by":"publisher","DOI":"10.1145\/2642708"},{"key":"e_1_3_2_1_22_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.peva.2013.08.014"},{"key":"e_1_3_2_1_23_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0306-2619(03)00048-5"},{"volume-title":"Demand response and open automated demand response opportunities for data centers. Lawrence Berkeley National Laboratory","year":"2010","author":"Mares K.","key":"e_1_3_2_1_24_1","unstructured":"Mares , K. Demand response and open automated demand response opportunities for data centers. Lawrence Berkeley National Laboratory ( 2010 ). Mares, K. Demand response and open automated demand response opportunities for data centers. Lawrence Berkeley National Laboratory (2010)."},{"key":"e_1_3_2_1_25_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-41321-1_13"},{"key":"e_1_3_2_1_26_1","first-page":"201","volume-title":"ICAC","author":"Ren S.","year":"2014","unstructured":"Ren , S. , and Islam , M. A . Colocation demand response: Why do i turn off my servers ? In ICAC ( 2014 ), pp. 201 -- 208 . Ren, S., and Islam, M. A. Colocation demand response: Why do i turn off my servers? In ICAC (2014), pp. 201--208."},{"key":"e_1_3_2_1_27_1","doi-asserted-by":"publisher","DOI":"10.1109\/EEM.2010.5558728"},{"volume-title":"A demand response action plan for europe-regulatory requirements and market models. Tech. rep","year":"2013","author":"Smart Energy Demand Coalition","key":"e_1_3_2_1_28_1","unstructured":"Smart Energy Demand Coalition . A demand response action plan for europe-regulatory requirements and market models. Tech. rep ., 2013 . Smart Energy Demand Coalition. A demand response action plan for europe-regulatory requirements and market models. Tech. rep., 2013."},{"volume-title":"Mapping demand response in europe today. Tech. rep","year":"2014","author":"Smart Energy Demand Coalition","key":"e_1_3_2_1_29_1","unstructured":"Smart Energy Demand Coalition . Mapping demand response in europe today. Tech. rep ., 2014 . Smart Energy Demand Coalition. Mapping demand response in europe today. Tech. rep., 2014."},{"key":"e_1_3_2_1_30_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2009.05.021"},{"key":"e_1_3_2_1_31_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2009.05.021"},{"key":"e_1_3_2_1_32_1","doi-asserted-by":"publisher","DOI":"10.1109\/COMST.2014.2341586"},{"volume-title":"Intl. Workshop on Feedback Computing","year":"2012","author":"Wang R.","key":"e_1_3_2_1_33_1","unstructured":"Wang , R. , Kandasamy , N. , and Nwankpa , C . Data centers as demand response resources in the electricity market: Some preliminary results . In Intl. Workshop on Feedback Computing ( 2012 ). Wang, R., Kandasamy, N., and Nwankpa, C. Data centers as demand response resources in the electricity market: Some preliminary results. In Intl. Workshop on Feedback Computing (2012)."},{"key":"e_1_3_2_1_34_1","doi-asserted-by":"publisher","DOI":"10.1145\/2602044.2602048"},{"key":"e_1_3_2_1_35_1","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2013.2274525"}],"event":{"name":"ICPP 2019: Workshops","sponsor":["University of Tsukuba University of Tsukuba"],"location":"Kyoto Japan","acronym":"ICPP 2019"},"container-title":["Workshop Proceedings of the 48th International Conference on Parallel Processing"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3339186.3339209","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,1,15]],"date-time":"2023-01-15T00:31:48Z","timestamp":1673742708000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3339186.3339209"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,8,5]]},"references-count":35,"alternative-id":["10.1145\/3339186.3339209","10.1145\/3339186"],"URL":"https:\/\/doi.org\/10.1145\/3339186.3339209","relation":{},"subject":[],"published":{"date-parts":[[2019,8,5]]},"assertion":[{"value":"2019-08-05","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}