Improvements & projects
Journeys with TfL keep getting brighter
Improvements across our transport network are helping to make the greener way to travel better for everyone. We're determined to build a greener future for London, with faster, more reliable, comfortable and safer journeys. Because every journey matters.
Scroll down to see a list of improvements currently in progress.
Current improvements
Our ongoing investment in the capital's transport network is improving London for everyone. Browse some of our improvements below:
-
A40 Westway
Work on the next phase of the project to refurbish the Westway is underway
-
A316 London Road roundabout
Improving the roundabout will make it easier to get to Twickenham town centre and improve journey times
-
Battersea Bridge safety
We're taking steps at Battersea Bridge to make the area safer for people walking and cycling
-
Bollo Lane
Ealing Council has given us permission to develop some of our land along Bollo Lane to create more than 900 new homes to rent and buy in Acton
-
Colindale station step-free access
Colindale station will have step-free access and a spacious new ticket hall by autumn 2025
-
Cycleway 9
Cycleway 9 will make cycling and walking easier, safer and more appealing on roads in west Kensington, Hammersmith, Chiswick and Brentford town centre
-
Elephant & Castle station
Work has started to prepare Elephant & Castle station for a new entrance and ticket hall
-
Four Lines Modernisation
We're transforming the Circle, District, Hammersmith & City and Metropolitan lines to increase capacity and boost reliability, making journeys faster and more comfortable
-
Hammersmith Bridge
We're supporting Hammersmith & Fulham Council to repair and reopen the bridge
-
High Speed 2 (HS2)
The railway being built by HS2 Ltd will start connecting to London's transport systems after 2029
-
Kentish Town station closure
Kentish Town Tube station is closed until the end of 2024 while we replace the escalators and improve station facilities
-
Kingston Cromwell Road bus station
The bus station will be closed until autumn 2024 while we redevelop it
-
Knightsbridge Tube station
Knightsbridge Tube station will have step-free access, reached by a new entrance at Hooper's Court, by mid-2024
-
Lambeth Bridge roundabouts
We aim to start work to transform the roundabouts at Lambeth Bridge from 2024
-
Leyton station step-free access
Leyton station will have step-free access and a spacious new ticket hall. Work will start in 2025
-
Naming London Overground lines
London Overground lines are to be renamed to make the network easier to navigate. We aim to rename the lines by December 2024
-
Nine Elms
Our work to help with regeneration around Nine Elms Lane and Battersea Park Road (A3205) is due to continue until 2025
-
Old Street roundabout and station
Work to make the Old Street area more pedestrian and cycle-friendly should be complete by early 2024
-
Paddington Bakerloo line ticket hall
Paddington Bakerloo line ticket hall has now reopened following the completion of works to improve the ticket hall
-
Piccadilly line upgrade
We're doing work to modernise the Piccadilly line and prepare for the arrival of new trains from 2025
-
River Lea Crossing
Work now underway on the River Lea Crossing will refurbish the bridge's entire structure, including both above and below the bridge deck
-
Silvertown Tunnel
We're building a new tunnel under the Thames, linking Silvertown to the Greenwich Peninsula in east London
-
South Kensington station
We're working to reduce congestion and improve access at South Kensington station
-
Step-free access
We're adding step-free access to more Tube and London Overground stations
-
Vauxhall Cross gyratory
We plan to return the one-way road system at Vauxhall to two-way roads
-
Wandsworth town centre
Plans are underway to regenerate Wandsworth town centre