iBet uBet web content aggregator. Adding the entire web to your favor.
iBet uBet web content aggregator. Adding the entire web to your favor.



Link to original content: http://en.wikipedia.org/wiki/Paris_Métro_Line_19
Paris Métro Line 19 - Wikipedia Jump to content

Paris Métro Line 19

From Wikipedia, the free encyclopedia
Line 19
Paris Métro Paris Métro Line 19
Overview
TerminiNanterre–La Folie
Aéroport Charles de Gaulle 2 TGV
Connecting linesParis Métro Paris Métro Line 15 Paris Métro Line 17 Paris Métro Line 18
RER RER B RER C RER D RER E
Transilien Transilien Line J (Paris-Saint-Lazare) Transilien Line H (Paris-Nord)
Tramways in Île-de-France Île-de-France tramway Line 2 Île-de-France tramway Line 5 Île-de-France tramway Line 11
Stations9 to 11
Service
SystemParis Métro
History
Planned opening2040
Technical
Line length25 to 30 km (16 to 19 mi)
Conduction systemAutomated
Route map

Nanterre–La Folie
Paris MétroParis Métro Line 15Paris Métro Line 17Paris Métro Line 18 RERRER E
Pont de Bezons
Tramways in Île-de-FranceÎle-de-France tramway Line 2
Argenteuil
TransilienTransilien Line J (Paris-Saint-Lazare) Tramways in Île-de-FranceÎle-de-France tramway Line 11
Ermont–Eaubonne
RERRER C TransilienTransilien Line H (Paris-Nord)Transilien Line J (Paris-Saint-Lazare)
Garges–Sarcelles
RERRER D Tramways in Île-de-FranceÎle-de-France tramway Line 5
Gonesse
Paris MétroParis Métro Line 17
Parc des Expositions
Paris MétroParis Métro Line 17 RERRER B
Aéroport Charles de Gaulle 2 TGV enlarge…
RERRER B CDGVAL SNCF

Handicapped/disabled access All stations are accessible

Paris Métro Line 19 is a new line of the Paris Métro that is planned as an expansion of Grand Paris Express. Officially announced on 22 November 2023, it is planned to connect Nanterre–La Folie at the west of La Défense business district to Charles de Gaulle Airport and the new area to be developed at Triangle de Gonesse [fr].[1] It will serve the residential areas of the department of Val-d'Oise, notably Argenteuil and Garges-lès-Gonesse, in order to make them more accessible and accelerate their urban renewal. According to the first studies, the line is expected to be opened by 2040.

Tracks and stations

[edit]

During initial planning of Grand Paris Express, the authorities of the department of Val-d'Oise expressed criticism as it was poorly served by the new lines to be built. On 3 April 2023, while construction of the Grand Paris Express metro lines was already in progress, Valérie Pécresse announced that a new line 19 was planned to be added to the urban development plan of the Île-de-France region (SDRIF), as a request from the department of Val d'Oise. [2] The initial routes to be considered were connections from Nanterre to Saint-Denis via Argenteuil and from Nanterre to Cergy also via Argenteuil.

On 22 November 2023, the Île-de-France region and the department of Val d'Oise announced jointly that the new line will eventually join Nanterre to Triangle de Gonesse, where it will connect to Line 17 heading to Charles de Gaulle Airport.[1] The line would be from 25 to 30 km long, serving from 9 to 11 stations depending on the route chosen. It will be essentially underground and fully automated.

Funding

[edit]

The Île-de-France region and the department of Val d'Oise will fund feasibility studies for an amount of 6 million euros. Total construction cost of the project is estimated at this stage from 5 to 6 billion euros.[3] Financial support from the French government is being considered. According to the President of the Île-de-France region, Valérie Pécresse, the latter is not opposed to participating in the construction of this new line.

Notes and references

[edit]
  1. ^ a b "Lancement du projet de la ligne 19 : un nouveau métro dans le Val d'Oise". 22 November 2023. Retrieved 27 November 2023.
  2. ^ "Un métro, la future ligne 19, devrait voir le jour et desservir le Val-d'Oise d'ici 2040". 6 April 2023. Retrieved 27 November 2023.
  3. ^ "Tracé, calendrier, budget… La ligne 19 du métro parisien en projet". 22 November 2023. Retrieved 27 November 2023.