iBet uBet web content aggregator. Adding the entire web to your favor.
iBet uBet web content aggregator. Adding the entire web to your favor.



Link to original content: http://en.wikipedia.org/wiki/Grand_Street_Shuttle
Grand Street Shuttle - Wikipedia Jump to content

Grand Street Shuttle

From Wikipedia, the free encyclopedia
"S" train symbol
Grand Street Shuttle
A remnant of the Grand St shuttle, which shows where shuttle trains stopped.
Northern endWest Fourth Street
Southern endGrand Street
Stations3
Started service1986
Discontinued2004

The Grand Street Shuttle was a New York City Subway service that operated during the long Manhattan Bridge rehabilitation project while the north tracks (connecting to the IND Sixth Avenue Line via the Chrystie Street Connection) were closed. It usually ran between Broadway–Lafayette Street and Grand Street, picking up the slack from rerouted or suspended B and D service.

History

[edit]

Service disruptions that took the Manhattan Bridge north tracks out of service, with the shuttle running between Broadway–Lafayette Street and Grand Street, included the following:

During the first phase of the Manhattan Bridge rehabilitation, from April 26, 1986 to December 11, 1988,[3] the shuttle was extended to 57th Street/Sixth Avenue, running via the Sixth Avenue local tracks, and was called the Sixth Avenue Shuttle while the B and D terminated at 34th Street–Herald Square. Regular service had been expected to resume on October 26, 1986.[4]

The final Grand Street Shuttle service began on July 22, 2001, again between Broadway–Lafayette Street and Grand Street, while the B and D services were truncated to 34th Street–Herald Square. The Sixth Avenue Shuttle (which also ended at Broadway–Lafayette Street) was ended on December 16, 2001 with the rerouting of F trains to the 63rd Street Tunnel and introduction of the V train, and the Grand Street Shuttle was extended north to West Fourth Street–Washington Square.[5][6] On April 27, 2003, service was decreased to run every 15 minutes instead of every 12 minutes at all times except late nights.[7] The rehabilitation was finished on February 22, 2004, and the shuttle was discontinued. Also during this time, a shuttle bus ran between Canal Street and Grand Street.[8][9][10]

Final route

[edit]
Station service legend
Stops all times Stops all times
Stops all times except late nights Stops all times except late nights
Stops late nights only Stops late nights only
Stops rush hours in the peak direction only Stops rush hours in the peak direction only
Time period details
Disabled access Station is compliant with the Americans with Disabilities Act
Disabled access ↑ Station is compliant with the Americans with Disabilities Act
in the indicated direction only
Disabled access ↓
Elevator access to mezzanine only
Grand Street Shuttle Stations Disabled access Subway transfers Connections
Manhattan
Stops all times West Fourth Street–Washington Square Disabled access
F Stops all times V Stops weekdays during the day (IND Sixth Avenue Line)
A all timesC all except late nightsE all times (IND Eighth Avenue Line)
PATH at Ninth Street
Stops all times Broadway–Lafayette Street Disabled access
F Stops all times V Stops weekdays during the day (IND Sixth Avenue Line)
4 late nights6 all times <6> weekdays until 8:45 p.m., peak direction (IRT Lexington Avenue Line at Bleecker Street[11])
Stops all times Grand Street

References

[edit]
  1. ^ "Trains Being Rerouted on Manhattan Bridge". The New York Times. March 12, 1984. p. B5. Retrieved November 3, 2011.
  2. ^ "Repair of the Subway Tracks on Manhattan Bridge is Done". The New York Times. Associated Press. November 2, 1985. p. 29. Retrieved November 3, 2011.
  3. ^ Annual Report on 1989 Rapid Routes Schedules and Service Planning. New York City Transit Authority, Operations Planning Department. June 1, 1990. p. 56.
  4. ^ "Washington Heights, Central Park West And Grand Concourse Riders Your Guide To Service Changes On The B D During Rehabilitation Work April 26 Through October 26, 1986". New York City Transit Authority. April 1986.
  5. ^ "Grand St Shuttle runs to West 4 St Beginning Sunday, Dec 16". Flickr. New York City Transit. December 2001. Retrieved July 8, 2020.
  6. ^ "63rd Street Connector In Service – New Schedules in Effect" (PDF). New York Division Bulletin. 45 (1). Electric Railroaders' Association: 13. January 2002.
  7. ^ "New BMT-IND Schedules" (PDF). The New York Division Bulletin. 46 (7). Electric Railroaders' Association: 20. July 2003.
  8. ^ Manhattan Bridge Service Changes, MTA service notice, 2001
  9. ^ New Subway Service!, MTA service notice, February 22, 2004; accessed April 21, 2010
  10. ^ "MTA NYC Transit Manhattan Bridge Information". February 5, 2004. Archived from the original on February 5, 2004. Retrieved September 18, 2016.{{cite web}}: CS1 maint: bot: original URL status unknown (link)
  11. ^ At the time, there was a transfer to downtown trains only. A bidirectional transfer was created after the shuttle's discontinuation.
[edit]